PLOIESTI
Intermodal Terminal
Rail Conatiner opened for its Clients, on February 2012, in South of Romania, the 2nd. Road-Rail Terminal operations having as a Partner, Allianso Terminal Ploiesti, moreover launched in the same time weekly block trains loaded with UTIs, on the railway route Crangu lui Bot – Constanta Harbor.
The trains frequency: 1 round trips weekly
The Terminal it is connected with Crangu lui Bot Railway Station
- Acces by road
- Acces by rail
- UTI’s deposit area = 30.000 sqm
- Loading/Unloading ramp by Rail/Road = 650 m
- Operating time: Truck – Wagon = 10 min.