MIERCUREA CIUC
Intermodal Terminal
Rail Conatiner opened for its Clients, on July 2012, in center of Romania, the 5th. Road-Rail Terminal operations and launched in the same time weekly block trains loaded with UTIs, on the railway route Miercurea Ciuc – Constanta Harbor.
The trains frequency: 2 round trip weekly
The Terminal it is connected with Miercurea Ciuc Railway Station
- Acces by road
- Acces by rail
- UTI’s deposit area = 16.000 sqm
- Loading/Unloading ramp by Rail/Road = 400 m
- Operating time: Truck – Wagon = 10 min.