BRASOV
Intermodal Terminal
Rail Conatiner opened for its Clients, on May 2013, in center of Romania, the 7th Road-Rail Terminal operations, moreover launched in the same time weekly block trains loaded with UTIs, on the railway route Brasov Triaj – Constanta Harbor.
The trains frequency: 2 round trip weekly
The Terminal it is connected with Brasov Triaj Railway Station
- Acces by road
- Acces by rail
- UTI’s deposit area = 2780 m2
- Loading/Unloading ramp by Rail/Road = 2 x 300 m
- Operating time: Truck – Wagon = 10 min.